Commercial Solar

Commercial Solar & Battery for FNQ Businesses

For motels, warehouses, light industrial and primary-production sites across FNQ, the numbers on commercial solar with storage are now compelling. We've delivered systems that cut peak demand charges, ride through grid events, and pay back inside 4 years.

Rated 5.0 on GoogleSAA Accredited (S0111813)Lic. 124167 · Cont. 82919Local since 2013

Peak demand charge reduction

Battery storage shaves your highest demand intervals — the single biggest line item on most FNQ commercial bills.

Three-phase Deye inverters

Engineered for serious commercial loads, with the same full 10-year warranty as our residential platform. Scale from 30 kW to 100 kW+.

Dyness Stack 100 batteries

High-current, modular commercial battery banks. Add capacity as your operation grows without scrapping the original install.

Live monitoring & reports

We hand over Deye Cloud access on day one. See generation, consumption, savings and event history in real time, from any device.

Commercial customers care about three numbers: payback, demand charge reduction, and uptime through grid events. We model all three on your actual interval data before we quote, so the business case is concrete — not a brochure.

Recent FNQ commercial installs include a soil testing warehouse in Tolga and the Kool Moon Motel in Atherton — both live case studies on this site, with real performance data pulled from Deye Cloud.

Why Shorecan

  • Commercial-grade Deye three-phase inverters and Dyness Stack 100 batteries
  • STC + LGC rebate handling included in every commercial quote
  • Independent designer and installer — no manufacturer pressure
  • Live monitoring with savings reports for your accountant

Related case studies

Real installs with live performance data.

Frequently asked questions

What size commercial system do I need?

It depends entirely on your load profile. Most FNQ small-to-medium businesses sit between 30 kW and 100 kW of solar with 30–80 kWh of battery. We pull 12 months of interval data from Ergon before sizing anything.

How fast does commercial solar pay back?

With current rebates, energy prices and battery economics, well-designed FNQ commercial systems are paying back in 3–5 years. After payback, the system continues generating for 15–20+ years.

Can you reduce my demand charges?

Yes — battery is specifically designed to shave peak demand intervals, which often dominates a commercial bill. We'll quantify the expected reduction in dollars before you sign.

Do you handle the grid connection paperwork?

Always. Ergon embedded-generation applications, network approvals and metering are part of every commercial quote — you don't chase any of it.

Ready for a free quote?

Local. SAA-accredited. Battery and off-grid specialists since 2013.

Request your quote